Battery Energy Storage System (BESS) project at the Diego de Almagro Sur Photovoltaic Plant, located in the Atacama Region.

The first 70 batteries out of a total of 221 have been installed by E-Storage,  a subsidiary filial of Canadian Solar. 

Total capacity:

228 MW of power
330 GWh of energy

Equivalent consumption:

It will enable the reduction of approximately 600,000 tones of CO₂ between  2026 and 2030

Status:

In development

Batteries:

201 battery containers of 1.2 MW each, 4.8 MW each, and 67 inverters of 4.4 MW

Online induction