Located in the Diego de Almagro district, the solar farm was built on a 330-hectare site, just two kilometers from the new Illapa substation.

PHOTOVOLTAIC FARM

INSTALLED CAPACITY

230 MW

EQUIVALENT CONSUMPTION

Approximately 316,000 people or 110,000 households

AVERAGE AnNual promedio

648 GWh, avoiding the emission of nearly 253,000 tons of CO₂ per year

cOMMERCIAL  OperaTION DATE

2022

Construction star

September 2020

grid connection

The generated power is fed into the National Electric System (SEN) at the Illapa Substation

LOCATION

Diego de Almagro (27 kilómetros) y poblado Inca de Oro (19 kilómetros).

Download the project fact sheet here.

DIEGO DE ALMAGRO SUR

Battery Energy Storage System (BESS)

The Diego de Almagro Sur BESS, located within the photovoltaic park, will play a key role in compensating for the daily fluctuations of solar power generation..

Learn more here.